Problem Machine Momentum Team Beyond Earth Get in touch

A robot that lays walls,
right on site.

Europe's construction sites are short two million workers by 2030. ERLEtek builds a mobile robot that prints walls on site today.

ESA BIC DenmarkDTU SkylabFirst project 2027
An ERLEtek co-founder positions the mobile printer robot before a demo wall pour.
01 — The problem

Construction can't hire its way out of this.

Europe's construction sector needs roughly two million more workers by 2030, driven by renovation targets, climate-adaptation projects, and a workforce that keeps getting older. Demand is rising faster than the industry can staff it.

The work hit hardest is often the least skilled and most physically wearing: pouring long, repetitive runs of concrete wall, by hand, on uneven ground, in the rain. It's the kind of job that stays open even when the pay is decent, because fewer people want to do it.

2M+
additional construction workers needed across Europe by 2030

02 — The machine

Mobile. Modular. Built for real ground.

ERLEtek's printer travels to the job site instead of the job site coming to a factory. It sets up next to the wall it needs to build, reads the terrain underneath it, and prints in place using a vibration-based process that works with both concrete and clay-based mixes.

A human crew still runs the site. The robot takes the part of the job that's long, straight or curved, and repetitive, so skilled workers spend their time on the parts that need judgment.

Flood protection walls Retaining walls Climate-adaptation infrastructure Harbour & coastal test walls Landscape architecture
Wall heightUp to 2 m
Wall thickness10 – 40 cm
Pilot run length~100 m, repetitive wall
MaterialsAgnostic
DeploymentQ2/Q3 2027
Business modelOEM — ERLEtek leases the robot, the customer's own crew operates it
Rear view of the printer's hopper and extrusion nozzle laying a concrete bead.
The printer head, seen from behind as it lays the material.
Close-up of the printer head shaping a fresh concrete wall section, layer by layer.
Each pass builds up one more layer of the wall.
03 — Momentum

Where we are.

DTU

Technology developed and first prototypes tested at DTU, Copenhagen.

ESA BIC Denmark

Accepted into the program, giving access to DTU's research network and ESA's technical resources.

Oct 2026

Roskilde load test: validating a 3D-printed floodwall's load-bearing capacity, the technical proof our partners need before construction starts.

Q2/Q3 2027

First project: a 100 m coastal floodwall protecting harbour-front homes from wave overtopping, built with our contractor partners.

2028

Target for a commercial-ready, deployable robot, following pilots through 2027.

04 — The team

Three people who've stood on a site.

ERLEtek's three co-founders at DTU Skylab, standing and seated around the printer robot.
Left to right: Jonathan Mikler (CTO), Pablo Alberdi Pagola (CEO), Lasse Olsen (COO), at DTU Skylab.

Jonathan Mikler

CTO

MSc, Autonomous Systems. Five years building robotics for agriculture startups.

Pablo Alberdi Pagola

CEO

PhD, Civil Engineering. Three years as a construction site manager before co-founding ERLEtek.

Lasse Olsen

COO

MSc, Sales Management. Five years in sales, including four years at Carlsberg.

05 — Get in touch

Have a wall to build?

For construction & infrastructure partners

Flood protection, retaining walls, climate-adaptation infrastructure, harbour and coastal work, landscape architecture — if you've got long, straight or curved wall runs, let's discuss the site, wall type, and requirements.

Investor? Reach out at lasse@erletek.io.