Business case Machine See it work On your site Momentum Team Beyond Earth Get in touch

Robots for your construction site.

One software brain and swappable tools, run by your own crew. We start with concrete projects. Next come paving, scaffolding, facade repair and more.

ESA BIC DenmarkDTU SkylabWater-tested Nov 2026First project 2027
The vision

One brain. Many robots.

Today

Concrete printing

Flood and retaining walls, printed on site. Pilots in 2027.

Next

A fleet for the site

One software brain on tracked, climbing and indoor robots, each with its own tools.

FoundationsKerbs & pavingFormworkScaffoldingFacade repairTunnel works
The curved horizon of the Moon against black space.
Beyond

Space

The same technology, taken to the Moon with the ESA ecosystem.

Beyond Earth →
The business case

100 m wall.
A third of the labour.

Construction daysLabour hours
Traditional method7 days120 h
ERLEtek robot5 days40 h

Estimate, crew of two.

30%
faster construction
70%
less labour on site
Our first robot

Mobile. Modular. Built for real ground.

The robot comes to the wall, not the other way round. It prints in place on real ground, while your crew runs the site and does the work that needs judgment.

Flood protection walls Retaining walls Climate-adaptation infrastructure Harbour & coastal test walls Landscape architecture
Wall heightUp to 2 m
Wall thickness10 – 40 cm
Pilot run length~100 m, repetitive wall
MaterialsAgnostic
Deployment2027
The red ERLEtek robot on rubber tracks at the end of a freshly printed concrete wall in the Roskilde test basin.
Printing a wall in the Roskilde test basin, October 2026.
The red ERLEtek robot at the end of a long printed concrete wall in the Roskilde test basin.
11 metres of wall, printed layer by layer.
On site

See it work.

Roskilde test build, 29 October 2026. 100 minutes of build time, shown as a time-lapse. Hand-filled from buckets in this test. On a project it's refilled straight from site supply, such as a dumper truck.
Tested with water

Then we flooded it. It held.

The printed concrete wall in the flooded test basin, with water standing just below its top. Held at 75 cm
11mlong wall
80cmhigh
100minbuild time on site
75cmwater, and it held
Water rising, time-lapse
From above
The printed wall face with the basin water standing just below its top.
Close-up of the printed concrete layers.

Water test in Roskilde, 5 November 2026. Water raised step by step from 15 cm to 75 cm. Any water behind the wall came in through the temporary barriers at its ends, not through the printed wall.

On your site

What it takes to run it.

Material supply

Refilled from your existing site supply, e.g. a dumper truck.

Materials

Standard concrete and low-carbon mixes.

Crew

One person from your own team.

Ground

Tracked, built for uneven ground.

Walls

Straight or curved. Up to 2 m high, 10–40 cm thick.

Process

Our own vibro-compaction 3D concrete printing.

Documentation

Water test passed in Roskilde, Nov 2026: the printed wall held 75 cm of water. Documentation for 2027 projects.

Momentum

Where we are.

DTU

Technology and first prototypes developed at DTU.

ESA BIC Denmark

Backed by ESA's incubator in Denmark.

Done Oct/Nov 2026

Roskilde: 11 m wall printed, held 75 cm of water.

Next 2027

Pilots on contractors’ sites.

2028

Commercial-ready robot.

The team

A team that knows the site, builds the tech, and sells it.

ERLEtek's three co-founders at DTU Skylab, standing and seated around the printer robot.
PA

Pablo Alberdi Pagola

CEO · Knows the site

PhD, Civil Engineering. Three years as a construction site manager before co-founding ERLEtek.

JM

Jonathan Mikler

CTO · Builds the robots

MSc, Autonomous Systems. Five years building robotics for agriculture startups.

LO

Lasse Olsen

COO · Sells it

MSc, Sales Management. Five years in sales, including four years at Carlsberg.

Photo, left to right: Jonathan Mikler, Pablo Alberdi Pagola, Lasse Olsen, at DTU Skylab.

Get in touch

Have a concrete project?

For construction & infrastructure partners

Send us the basics and we'll tell you if it's a fit for a 2027 pilot.

  • What you need built
  • Size and quantities
  • Location and timing
  • Drawings, if you have them

Lasse Olsen, COO · lasse@erletek.io

Investor? Reach out at lasse@erletek.io.