Beyond Earth

The same machine raises a bigger question.

If a robot can print a wall without a factory around it, reading unfamiliar ground and working with whatever material is on site, it's already halfway to a much harder job: building with regolith, the loose material that covers the Moon's surface, with no crew standing next to it.

ERLEtek is part of ESA BIC Denmark, which backs that parallel track: testing our vibration-printing process on regolith-like material, and researching how it could run with minimal human presence at all. It lines up with ESA's own push toward in-situ resource utilization — building with what's already there instead of shipping material from Earth.

The long-term model

Erle means bee in Basque. Our long-term model is a Robotic Beehive: a swarm of robots building different sections of a structure at once, coordinating digitally so no two machines get in each other's way.

Close-up of a test print made with regolith-simulant material, showing the layered bead structure left by each pass of the nozzle.
Tested with regolith. Space environment next.

In September 2026, ERLEtek presented at ESA's Space for Inspiration event in Copenhagen. The King of Denmark's delegation, ESA astronaut Andreas Mogensen, and Minister Christina Egelund stopped by to hear about the work. Construction methods don't change much by region, so a printer proven in Denmark should travel — early interest has already come in from teams in:

Europe North America Japan Australia Africa
ERLEtek presenting its printer to Denmark's King Frederik X, ESA astronaut Andreas Mogensen, and Minister Christina Egelund at ESA's Space for Inspiration event in Copenhagen.
Presenting to the King's delegation and ESA astronaut Andreas Mogensen, Copenhagen, September 2026.
Investing

Back this, too.

For investors

We're raising to get the robot commercial-ready by 2028, with pilots running through 2027. If you back deep tech, construction, or space, we'd like to talk.

Email Lasse